Took a break from the endless monotony of painting today and fixed the walls in the basement entry. This is where the fridge used to be, and the walls were very damaged. All done and patched, they will need sanding and painting. Looks soooo much better.
Before:
After
Today I also laid the rest of the tile in the bathroom that doesn't need cutting. Plus started measuring for the wall repair in the shower. Having trouble with the hole saw, it doesn't cut very well. Not sure why, so that's a puzzle to figure out tomorrow.