Saturday, December 29, 2007

Rehab week in review

Got a lot done for a short week.
- Finished painting the wall color in both bedrooms
- painted the bathroom and repaired the toilet
- installed gfcis in the bathroom and kitchen
- finished painting the kitchen
- reinstalled the stove hood
- removed more grout

Here is a picture of the kitchen beam area that was repaired. The paint color is not that much different, but amazing how updated it looks (Brandied Pear by Olympic)



Here is the kitchen in it's current state. The dishwasher is fitted in, but not hooked up. Wanted to make sure cupboard doors and such could open before putting on the counter top plywood.


Plans for next week:
- continue with grout removal. This takes forever, even with the dremel
- repair broken tiles
- install plywood for counter tops
- add box to install bathroom light

Friday, December 21, 2007

Rehab week in review

Got a lot of stuff done this week:

Removed counter tops
Finished painting the living room
Installed new light fixtures
Painted the master bedroom
Got the plumbing fixed
Painted the stairwell
Repaired the ceiling beam area
Painted the range hood white
Started grout removal

I should be done with the painting next week. That is really the thing that takes the longest!