Lot of mishmash stuff got done this week:

- Handyman came in and wired the kitchen, did plumbing in kitchen, removed toilet waste pipe in closet, fixed a few upstairs outlets and fixed some plumbing in the basement.

- Continued painting: all the priming has been done. Final coats on 2 of the bedrooms, trim painted in all the bedrooms (mostly), stairwell and hallway got first coat of color.

- installed range hood
- put up light fixtures in dining room and living room
- dug up plants/weeds in the front garden beds
- general cleanup of stuff as the house was getting cluttered with stuff
- finished tiling the area by the back door and basement


This week will see continued trim painting (and painting, more and more painting), hopefully pavering the front stoop, bathroom light fixture and outside work.