Seems like more and more little projects are winding up now.
Except the floors, which was a big project!

Finished this week:
- Kitchen counter top backsplash installation and grouting
- counter top oak trim varnished
- Cabinet hardware installed
- kitchen sink installed with dishwasher drain pipe
- all floors sanded and seal coat put down
- landscaping in the front

The house has two kinds of wood floors, downstairs is oak, and upstairs is red pine. The pine is really fragrant after sanding. Very resinous.

Will probably put one coat of poly down on the floors this weekend to get them started.